Siting: A firm level base protected from weather - building, marquee or temporary structure, with minimum access width 1 metre. Size of required area is determined by the facilities required. A site visit will be required to assess suitability of site.

Water: A constant and solely designated water supply is required when the system is in use - 3 bar pressure is advisable. Ideally a 25mm blue alkathine pipe with a stop cock should be provided but we can provide a water bowser with booster pump if required at additional cost.

Electric: A basic 3+1 system will need 2 x 16 amp (240v) supplies. Larger installations will require additional supplies, depending on the total equipment provided.

Drainage: Ideally all waste can be discharged into drainage facilities on site – it can be pumped up to 100 metres from the toilet area. Alternatively waste storage tanks can be provided at additional cost. No chemical is used so your drainage system will not be affected.